
This sequences was extremely hard to put together as i needed more space when shooting which made the editing extremely hard.
I have taken small parts out of all the floor shots and merged them into one long floor.
I then cut out the rail to use as the main rail
I then individually cut out each sequences shot to maintain the pure black background.
I then took parts of legs and skates and cloned them over the parts where the rail was ontop of the skater
I then finished by adding a slight vignette over the floor
It took around 6 hours of straight editing with no breaks
This is around 3 different sequences put together to make one big shot due to the room we had.
1 run up shot, 1 trick shot and 1 landing shot
No comments:
Post a Comment